|
|
 |
| | This is how it looked on the trailer | |
|
 |
| | It took two plus days to come up from Wilmington CA. The bridge over Lake Shasta was closed
to loads over 13' wide so they needed to make about a 6 hour detour that required 2 pilot cars, once in Oregon only a single pilot car was required. | |
|
 |
| | Starting to get the tie downs off. | |
|
 |
| | Another good view of how it sat on the trailer | |
|
 |
| | Starting to get the boat stands and blocking in place | |
|
 |
| | Safely in its temporary home | |
|
 |
| | Just waiting for the work to begin. | |
|